Sierra Hybrid Cath lab

Hospital of Providence Sierra Campus
The new Hybric cath at the Sierra campus is the first of its kind in el Paso. The project was completed in 2015. AEG design the heating , cooling and ventilation, plumbing and medical gas systems in strict compliance with the Texas Department of state health services. AEG coordinated design work with all sub consultants. The HVAC systems are controlled using the Siemens DDC energy management system and its capable of maintain room temperature between 55 F to 78 F and 50% Relative Humidity.

sierra hybrid cathlab (17)

sierra hybrid cathlab (16)

sierra hybrid cathlab (15)

sierra hybrid cathlab (14)

sierra hybrid cathlab (13)

sierra hybrid cathlab (12)

Tags: Article, Research, Success

Leave a Reply

Your email address will not be published. Required fields are marked *